top of page

Structural integrity of new school questioned

  • Clinton Haywood
  • Jan 10, 2017
  • 1 min read

Received an email from a staff at Ridgeview wanting me to check into the structural integrity of Ridgeview. Apparently over the break the construction crew came in and replaced several rows of tile that had cracked with a shift. Down the long hallway they also cut stress lines in the middle of tiles at various points. Along with these cracks have developed in the theater and in front of the middle school office. The school board might want to consider this before forcing a new elementary school to be added to land that may not be properly settled.


 
 
 

Comments


Also Featured In

bottom of page